Courtney Way & Linton School Pools
Area: 1,000 m2
Project Description
Cambridge County Council instructed CBS to design the services for two new hydrotherapy pools for special needs.

The design included for the re-circulation of the pool water through a filtration and treatment plant to provide both filtration and disinfection of the water to the relevant standards set by the Pool Water Advisory Group and the Ph of the water was also controlled.

In addition to the pool plant, new ventilation services together with lighting for the pool hall and underwater were designed. 


132 Royal College Street London  NW1 0TA  Tel: 020 7428 8640  email: cbs@cbs-uk.com